Altius Surya TechAltius Surya Tech Pvt. Ltd.AI-Kit Industrial Intelligence Platform

Field validation

3-Pilot Field Validation

Field evidence from three operating solar-pump deployments with different instrumentation, AI roles and control maturity.

3 FIELD PILOTSReal field telemetry · Transparent evidence classification · No synthetic pilot included

Configuration & validation comparison

Three different field deployments

Configuration comes from the Asset Capability Registry; evidence status and rolling coverage come from the common Benefit Evidence framework.

Pilot 1 · Field deployment

CSV Fountain

Bengaluru, Karnataka

Deployment
Operating solar-pump field deployment
Pump
Kirloskar 2 HP pump
VFD / Controller
INVT GD20
Solar / Power
UNAVAILABLE
Frequency telemetry
MEASURED
Water instrumentation
ZTEK flowmeter
Water evidence
ZTEK measured flow
AI role
AI frequency optimisation
AI intelligence
Frequency recommendation and controlled comparison
Control authority
Supervised frequency write; remote Start/Stop not validated
Control maturity
Frequency write physically validated; no autonomous-control claim
Historical evidence
AVAILABLE
Current evidence class
MEASURED
Long-term verified AI benefit
NOT YET VERIFIED

Evidence maturity

OPPORTUNITY EVIDENCE + PRELIMINARY CONTROLLED FIELD EVIDENCE

Not yet verified: Long-term AI benefit and remote Start/Stop.

Pilot 2 · Field deployment

Sambhrama BH-3

Denkanikotta, Tamil Nadu

Deployment
Operating solar-pump field deployment
Pump
UNAVAILABLE
VFD / Controller
Amrut solar pump/controller + RMS
Solar / Power
UNAVAILABLE
Frequency telemetry
MEASURED
Water instrumentation
Measured flow / water telemetry
Water evidence
Measured flow and water
AI role
Expected Flow AI performance comparison
AI intelligence
Measured actual compared with modelled expected flow
Control authority
Read-only / advisory; no physical AI control claim
Control maturity
Predictive and model-validated performance
Historical evidence
AVAILABLE
Current evidence class
MODELLED
Long-term verified AI benefit
NOT YET VERIFIED

Evidence maturity

MODEL-VALIDATED PERFORMANCE

Actual = MEASURED · Expected = MODELLED

Not yet verified: Executed AI intervention or long-term AI benefit.

Pilot 3 · Field deployment

Dharani

Hosachiguru, Karnataka

Deployment
Operating solar-pump field deployment
Pump
Texmo Taro 7.5 HP pump
VFD / Controller
Fuji FRENIC-Mini
Solar / Power
8.25 kWp PV
Frequency telemetry
MEASURED
Water instrumentation
No physical flowmeter connected
Water evidence
ESTIMATED — no direct flowmeter
AI role
Supervisory / advisory AI
AI intelligence
Advisory frequency intelligence alongside local MPPT
Control authority
LOCAL MPPT RETAINS CONTROL
Control maturity
Advisory only; no physical AI frequency write
Historical evidence
UNAVAILABLE
Current evidence class
ESTIMATED
Long-term verified AI benefit
NOT YET VERIFIED

Evidence maturity

ESTIMATED-WATER EVIDENCE

Water = ESTIMATED · AI = ADVISORY · LOCAL MPPT RETAINS CONTROL

Not yet verified: Measured water or executed AI intervention benefit.

REPEATED CONTROLLED FIELD EVIDENCE

2 BENEFIT-DEMONSTRATION TESTS

98.1%

AVERAGE MEASURED WATER DELIVERY MAINTAINED

10.7%

AVERAGE REDUCTION IN VFD-REPORTED MOTOR LOADING

PRELIMINARY EVIDENCE

Across 2 qualifying controlled field tests, AI-Kit maintained 98.1% of measured water delivery on average while VFD-reported motor loading was 10.7% lower on average. Results remain preliminary.

Qualifying controlled tests

20 Aug 2026

BENEFIT DEMONSTRATED

Recommended frequency: 33 Hz

98.3% measured water delivery maintained · 7.9% lower VFD-reported motor loading

12 Aug 2026

BENEFIT DEMONSTRATED

Recommended frequency: 32.5 Hz

97.9% measured water delivery maintained · 13.5% lower VFD-reported motor loading

Excluded tests

19 Aug 2026

ABORTED

Control fault · Excluded from aggregate

15 Aug 2026

INCONCLUSIVE

Solar variation prevented reliable comparison · Excluded from aggregate

Long-term VERIFIED AI BENEFIT: NOT YET ESTABLISHED.

Common rolling evidence framework

Last 10 Days — Field Evidence

Each pilot keeps its appropriate evidence units and classifications; no forced fleet-wide numeric KPI is calculated.

Pilot 1

CSV Fountain

Evidence period
2026-08-12 to 2026-09-19
Valid evidence days / coverage
4/10 days · 40%
Key observed result
98.3% water maintained · 7.9% lower VFD-reported motor loading
Controlled / intervention result
10.7% average lower VFD-reported motor loading · 98.1% average water maintained
Evidence class
MEASURED
Data-quality note
2 rows require data review; excluded from benefit claims.
View Pilot Evidence →

Pilot 2

Sambhrama BH-3

Evidence period
2026-09-13 to 2026-09-19
Valid evidence days / coverage
7/10 days · 70%
Key observed result
251.8 LPM
Controlled / intervention result
No verified intervention result
Evidence class
MODELLED
Data-quality note
65 operating samples support the daily actual/expected comparison.
View Pilot Evidence →

Pilot 3

Dharani

Evidence period
2026-08-11 to 2026-08-11
Valid evidence days / coverage
1/10 days · 10%
Key observed result
Estimated water opportunity unavailable
Controlled / intervention result
No verified intervention result
Evidence class
ESTIMATED
Data-quality note
1 row require data review; excluded from benefit claims.
View Pilot Evidence →

Current status and historical evidence

Current connectivity does not erase evidence already available from historical sources.

Pilot 1

Current field status

STALE

Historical evidence

AVAILABLE

Controlled optimisation history: AVAILABLE

Quality-qualified daily ZTEK flow history: NOT YET PERSISTED

Pilot 2

Current field status

ONLINE

Historical evidence

AVAILABLE

Pilot 3

Current field status

STALE

Historical evidence

UNAVAILABLE

How to read the evidence
MEASURED
Direct field sensor, VFD or RMS telemetry.
MODELLED
Calculated from an existing trained or authoritative model.
ESTIMATED
Indirectly calculated because direct instrumentation is absent.
PRELIMINARY CONTROLLED FIELD EVIDENCE
A controlled comparison requiring further repeat validation.
DATA REVIEW
Anomaly or insufficient data; unsuitable for a benefit claim.
UNAVAILABLE
Required evidence does not exist.